Area occupied: (32 ha)
Waste accepted / treated: Construction and demolition wastes; Municipal and similar waste, including selectively collected fractions; Garden and park waste; Other similar municipal waste.
Treatment process: (Controlled disposal of non-hazardous municipal waste with energy production.)
Origin: Municipal Collection and Similar waste.
Maximum processing capacity: (5 045 364 ton - design)
Start of operations: 1995 (CM Seixal) and 1997 passed to Amarsul